Project Brief :
The brief for this project was to design and build a energy efficient commercial swimming pool. The pool was designed to be a place where guests can relax and leave rejuvenated.
Size :
12m x 5m
Features:
LED lighting, Roller and cover, welded liner
Duration:
24 Weeks






