New swim school in Ireland
30 Jun, 2010
By Polypool15 June 2010
POLYPOOL SWIMS TO SUCCESS IN IRELAND
Ireland’s first purpose-built private swim school is enjoying the energy saving benefits of Polypool’s heat-retaining pool panel system. Polypool has designed a bespoke hopper-style pool for the new Water School in West Cork as part of a complete commercial package. Specified for high bather usage, the 16m x 7m swimming pool includes a filtration system with fast water turnaround, high durability liner, humidification control, and easy system management via an electronic display panel with remote control.
Polypool’s insulated pool panel construction enables easy installation and ensures effective thermal insulation of the pool shell, reducing heat lost into the surrounding ground, saving energy, and cutting heating bills. The patented system retains up to 96% of heat that would normally be lost through the pool walls and floor using traditional construction methods. Experienced swimming instructor, Clive Seawright, who set up the Water School, says Polypool’s heat retention performance has exceeded his expectations. He comments: “The pool has an operating temperature of 30 degrees C and we had planned for a 2 degree heat loss during days when the pool is in constant use, but in fact we’re only losing 1 degree, resulting in an even greater saving on projected energy bills.”
Providing safe, chemical-free swimming conditions was another important requirement for the new Water School. Polypool recommended a natural oxygen purification system that uses electronic oxidisation technology to provide 100% protection from bacteria for bathers without the negative effects of using chlorine, bromine, or other water cleaning chemicals.
Polypool was also able to advise the Water School on a cost-effective heating system. An open loop water-to-water heat pump system has been installed, which utilises a nearby river as a source of heat for producing hot water for the swimming pool, as well as the underfloor and air heating systems.
Prior to opening the Water School, Clive Seawright offered private lessons in the municipal baths but found local facilities couldn’t match demand. “At one time I had a waiting list of 300,” he explains. “Now I can offer personal tuition for all ages - the oldest to date is an 87 year old! Polypool’s high quality system and ability to offer a complete service from start to finish, including pool design and all the associated plant, has played a huge part in the success of the school and I’m now teaching up to 700 children and adults a week to swim.”
The complete Polypool solution is perfect for in-ground swimming pool projects for schools, spas, leisure clubs, and luxury domestic developments, and is particularly ideal for hydro-therapy pools where a higher constant temperature needs to be maintained. Polypool’s engineers seek to be involved in the earliest stages of design to attend to such details as filtration inlets/outlets and under water lights. Manufacturing is scheduled to suit the project requirements, and delivery on site can be as little as two weeks from order. Installation may be carried out by a Polypool recommended contractor, or by any competent groundworks contractor with the assistance of Polypool’s site support engineers. Wall panels simply cam-lock together and are held in place by bottom and top tracks. In fact the structure is so simple to assemble, the company also has a successful track record supplying kits to the self-build project sector.
With over 40 years of experience in swimming pool construction technology, Polypool already has a clear lead in insulated pool wall and panel systems that combine the benefits of affordability ease of installation, and effective heat conservation. Recent developments have given Polypool an expanded product range and better serviced network of dealers and installers. For more information please visit www.polypool.co.uk.
More news
23 Feb, 2012
Swim in the Spring
04 Apr, 2011
Polyrooms launched
13 Oct, 2010
2010 Special Offers!
08 Oct, 2010
Heatwave pool a huge success
20 Jul, 2010
Polypool stands the test of time
08 Jul, 2010
Polypool support local Rotary Club
07 Jul, 2010
Polypool dives into export market
30 Jun, 2010
New swim school in Ireland
23 Jun, 2010
Phillamores - Exclusive properties with basement pools
24 May, 2010
Exclusive Fairmile Development Launching June 17th
21 May, 2010
10 year Anniversary - Save £1000's
20 May, 2010
10 Year Anniversary - FREE UPGRADE
14 May, 2010
Insulate to accumulate
23 Apr, 2010
Polypool expanding sales team
23 Apr, 2010
New Sales Director
23 Apr, 2010
New showroom planned for 2010
23 Apr, 2010
New contracts manager
08 Apr, 2010
Be prepared for new Part L with Polypool
06 Apr, 2010
Energy Efficient And Affordable Swimming Pool
06 Mar, 2010
Building Regulations Review - Section 61 and 62 renewable energy




